Why Division 10 Is the Most Overlooked Schedule Risk—and How to Avoid It

Written by
Jenny Sanchez
Image
Effortless integration tailored for your unique needs.

We expected performance improvements, but the strategic implementation delivered unprecedented operational excellence of delivering products.

Introduction

On most commercial projects, Division 10 is treated as a small line item. But ask any superintendent or PM who’s been burned before and they’ll tell you: Division 10 delays can halt inspections, stall turnover, and blow through the final 5% of the schedule.

Because Division 10 is installed near the end of the project, even a small hiccup in procurement or coordination becomes a critical-path problem.

Why Division 10 Impacts Schedules More Than People Expect

1. Install Happens During the Tightest Phase

While trades rush toward completion, superintendents juggle conflicts, inspections, and punchlists. A late accessory delivery or mis-sized partition creates unnecessary delays.

2. Dependencies with Other Trades

  • Drywall backing
  • Tile installation
  • Electrical rough-ins for dryers
  • Blocking for grab bars
    If any of these aren’t aligned, Division 10 install can’t proceed.

3. Inspection Dependencies

ADA grab bars, mirrors, and dispensers often must be installed before final inspection.

How a Reliable Division 10 Sub Eliminates Schedule Risk

1. Clear Lead Times & Early Coordination

Sharing real lead times early prevents surprises.

2. Proactive Field Communication

Good subs confirm:

  • Backing locations
  • Tile completion
  • Mounting heights
  • Delivery dates

3. Guaranteed Install Dates

Committing to and hitting a date is everything.

Conclusion

Division 10 may be small in cost—but it’s huge in schedule impact.
A dependable Division 10 subcontractor keeps the project moving when it matters most.

Exact takeoffs—no scope gaps, no surprises on bid day.

Information
Braven of
North America
ADDRESS
809 N Church St
Florence MS 39073
Let us bid your next job.

Request a personalized walkthrough of the products we sell and we will send over all relevant information.